Call (647) 513-1585 Get an Estimate

Our services

Professional Sod Installation in Toronto

Imagine stepping outside to a bright, green lawn every day. We lay fresh sod across Toronto and the change happens the same day we roll it out.

Freshly laid sod lawn with tight seams and rolled sod at the edge of a Toronto front yard

Imagine stepping outside and seeing a bright, green lawn every day. That’s what sod gets you. No thin spots, no waiting on seed. We roll out fresh grass and your yard has a whole new look the same day.

Good sod starts with good prep. We grade the yard so the new lawn sits flat, lay each roll with tight seams, and water everything in. The install itself takes a few hours to a day, then the sod needs about 2 to 3 weeks to settle in and start rooting. Stay off it for a few weeks while it grabs hold.

The photos below are one of our own front-yard jobs, delivery day to first watering. If you’d like the same thing out front of your place, the quote is free.

Every yard is different, so we price after seeing yours. The quote is free and there is no obligation.

Why it's worth it

What sod installation does for your home

Instant green lawn

The rolls go down green and the lawn looks finished the same day.

Better lawn health

Fresh sod gives your lawn a healthy, even start from day one.

Easy to take care of

Water it in while it settles, then care for it like any other lawn.

Stops soil from washing away

Sod holds your topsoil in place, so heavy rain doesn't wash it away.

Looks beautiful

An even sheet of green sets off everything else in the yard, from the gardens to the front walk.

Our work

Real sod installation projects

Photos from our own job sites around Toronto.

Good to know

Questions homeowners ask us

How long does it take for new sod to root?

About 2 to 3 weeks. New sod needs that time to settle in and start rooting into the soil underneath.

When can I walk on my new sod?

Wait a few weeks. The roots need that time to grab hold, so keep foot traffic off the lawn while it settles.

How long does sod installation take?

The installation itself takes a few hours to a day, depending on the size of the yard. By the time we pack up, the lawn is laid, watered in, and green.

Ready to talk sod installation?

Tell us what you have in mind. We'll come take a look and give you a free, no-obligation quote.